| |
| 2016 |
KOSPO Shinincheon Green Power |
EMS-RTU |
| |
| 2015 |
KOSEP Samcheonpo TPP |
EMS-RTU |
| EWP Ulsan CHP |
EMS-RTU |
| KPX |
Power Plants & Substations RTU Operation Status Check & Verification Service |
| Doosan Heavy Industries & Construction for Shinboryung TPP |
AGC Simulator |
| eTEC E&C for Gunjang Energy |
EMS-RTU/DPS (Dispatch Phone System)/PQVf |
| Daewoo Pocheon CC |
EMS-RTU & DPS (Dispatch Phone System), Tariff-Metering, PQVF, Protection Panel |
| Sukmoon Energy |
EMS-miniRTU |
| |
| 2014 |
GS E&C for Andong LNG PP |
EMS RTU |
| Lotte E&C-BHI for Daegu CHP |
EMS-RTU & DPS (Dispatch Phone System) |
| EWP Honam TPP |
EMS-RTU |
| KOSPO Samchuk Green Power |
EMS-RTU |
| LH Asan |
EMS-RTU |
| KPX |
Power Plants & Substations RTU Operation Status Check & Verification Service |
| |
| 2013 |
KHMP Wooljin NPP |
EMS-RTU |
| KOSPO Namjeju TPP |
Integrated Monitoring System for Electric Power Exchange |
| ABB Korea |
EMS-miniRTU |
| Sungshin Cement |
EMS-RTU |
| KOSEP Youngdong TPP |
EMS-RTU |
| |
| 2012 |
Hyosung (for Dangjin Hyundai Green Power) |
EMS-RTU & DPS (Dispatch Phone System) |
| KHMP Kori NPP |
EMS-RTU & DPS (Dispatch Phone System) |
| KHMP Samrangjin PPP |
EMS-RTU & DPS (Dispatch Phone System) |
| KOSPO Namjeju TPP |
EMS-RTU |
| KOSEP Youngdong TPP |
EMS-RTU |
| KOSPO Hadong TPP |
EMS-RTU & Value Added Service System |
| KHMP Wooljin NPP |
EMS-RTU |
| EWP Donghae TPP |
EMS-RTU |
| EWP Ulsan CHP |
EMS-RTU |
| KOSEP Sanchunpo TPP |
Integrated Power Output Value Display System |
| KOMIPO (Korea Midland Power Co.Ltd,) Boryung TPP) |
AGC Following Status Analysis System |
| |
| 2011 |
KHMP (Korea Hydro & Nuclear Power Co., Ltd.) Youngkwang NPP |
EMS-RTU |
| KOSEP Sanchunpo TPP |
EMS-RTU |
| EWP Donghae TPP |
EMS-RTU |
| KHMP Wolsung NPP |
EMS-RTU |
| |
| 2010 |
Daewoo E&C (for Paju CHP) |
EMS-RTU |
| Hyosung for LH Daejeon WS |
EMS-RTU & DPS (Dispatch Phone System) |
| Hyundai Green Power for Dangjin |
EMS-RTU |
| KOSPO Namjeju TPP |
EMS-RTU |
| KOSEP Sanchunpo TPP |
AGC Simulator system for unit #3,4 |
| |
| 2009 |
ABB Korea: Pankyo CHP |
EMS-RTU & DPS (Dispatch Phone System) |
| EWP (Korea East-West Power Co. Ltd) : Ulsan TPP |
EMS-RTU |
| KOSEP (Korea South East Power Co.Ltd) : Yeosu TPP |
EMS-RTU |
| KPX (Korea Power Exchange) |
RTU for K-EMS Function Test |
| Hyosung (for Dangjin Hyundai Green Power) |
EMS-RTU |
| KOSPO (Korea Southern Power Co.Ltd) : Youngwol CCPP |
EMS-RTU |
| |
| 2008 |
EWP (Korea East-West Power Co. Ltd) : Ulsan TPP |
EMS-RTU |
| KOSPO (Korea Southern Power Co.Ltd) : Hadong TPP |
EMS-RTU |
| |
| 2007 |
Certified as Innovative Electric Power Industry Venture Company : Specialized in Electric Power Industry IT (by KEPCO) |
| Certified as Venture Company : R&D (by KIBO) |
| Certified as Inno-Biz (by SMBA: Small and Medium Business Administration) |
| Developed Intelligent EMS-RTU for Electric Power Exchange |
| |
| 2002 |
Capital Increase |
|
| |
| 2001 |
ISO 9001 & 14001 Certified |
|
| |
| 1995 |
R&D Center Approved (by KOITA: Korea Industrial Technology Assocition) |
| |